- Aridity class
- Semi-arid
- P/PET range
- P/PET 0.20–0.50
- Area covered
- Not consolidated
- Duration
- Rehabilitation sites assessed at 2–22 years
- Main intervention
- Mine-spoil landform reconstruction, topsoil placement and seeding
- Approach
- Technique-based
- Evidence strength
- High evidence — paired sites across 2–22 years
- Last assessment
- The report cites paired-site evidence and contrasts it with projected convergence at Meandu over 16–36 years.
Assessment summary
The source documents successful establishment of vegetation cover but not recovery of ecosystem function. It classifies the case as decoupling and identifies a material risk of secondary degradation.
Visual context
Overview
Rehabilitation sites in the Bowen Basin reconstruct spoil landforms, spread topsoil and seed vegetation under regulatory obligations. The documented rehabilitation ages range from two to twenty-two years, but the total extent is not consolidated.
Third-party paired-site studies report established cover dominated by buffel grass, steep slopes, hostile soil chemistry and low resemblance to the intended native ecosystem. The report therefore treats the case as restored cover without restored function.
Context
- Climate
- Regional rainfall data are drawn from Bureau of Meteorology stations along a regional gradient.
- Hydrology
- No comparable groundwater or water-stock evidence was available in the documentary assessment.
- Soil
- Mine spoil with elevated pH and electrical conductivity and low organic matter.
- Topography
- Reconstructed spoil landforms with slopes reported as 2.5 to 7 times steeper than target conditions.
- Initial degradation
- Open-cut coal mine spoil with hostile substrates and altered landforms.
- Governance
- Private coal producers operating under regulatory rehabilitation obligations.
Intervention
What was done: Spoil landforms were reconstructed, topsoil was spread and sites were seeded.
Who carried it out: Coal producers under regulatory obligation.
How it was financed: Regulatory financial provision
Approach type: The report classifies the intervention as technique-based.
Estimated cost: No documentary access to cost per hectare.
Trajectory
Vegetation cover has been established, but the report finds that the restored surface does not converge on the intended native ecosystem function.
2–22 years after rehabilitation
Paired-site evidence documents established cover but persistent functional problems.
16–36 years
A Meandu comparison cited by the report projects convergence over this longer period.
Textual alternative: the trajectory is not a straight line of improvement or decline. Reading it as continuous decline, or as continuous recovery, would both misrepresent it.
Buffel grass, encouraged by fertilisation, is described as locking sites into a monospecific, fire-exposed and ecologically dysfunctional trajectory.
Economics and investment
Two distinct metrics are tracked separately and must never be combined into one figure: documented investment (a specific reported amount, tied to a scope and a date) and cost intensity (a cost-per-hectare or cost-per-outcome rate). A project can have one, both, or neither reported — reporting one is not evidence of the other.
- Documented investment
- Not reported
- Cost intensity
- Not reported
- Economic model
- Regulatory financial provision
Rehabilitation is financed through regulatory provisions imposed on private coal producers, but the report provides no comparable project or per-hectare cost.
Editorial interpretation, not a reported fact: The source notes regulatory financial provision but provides no accessible cost figure.
Evidence gaps
- Total rehabilitated area is not consolidated.
- No documentary cost per hectare.
- No comparable groundwater or water-stock assessment.
- No surface-energy-flux assessment.
- No dew monitoring.
- No project-specific regional climate analysis beyond a bibliographic trend.
People and organisations
Private operators responsible for rehabilitation under regulation.
The report identifies regulatory obligation but does not name a specific authority on the project sheet.
Deserts.eco does not publish individual contact details without permission.
Bibliography
- Régénération des zones arides — Une grille de lecture pour évaluer les trajectoires de régénération et en attribuer les causes. Volet A — Cadrage méthodologique La Manufacture du Climat, prepared for the Regenerative Foundation. Supports: Bowen Basin treatment, non-consolidated area, rehabilitation age, third-party evidence, decoupling trajectory and identified evidence gaps.
Methodological note
- Assessment scope
- LMDC comparison of documented mine-rehabilitation outcomes, including paired sites aged 2–22 years.
- Limitations
- The total area, costs, water stocks and energy fluxes were not available in comparable documentary form.
- Methodology version
- LMDC first iteration
- Date
- 2026-06