Decoupling — cover restored, function not achieved High evidence — paired sites across 2–22 years

Bowen Basin

Australia · Bowen Basin, Queensland

Aridity class
Semi-arid
P/PET range
P/PET 0.20–0.50
Area covered
Not consolidated
Duration
Rehabilitation sites assessed at 2–22 years
Main intervention
Mine-spoil landform reconstruction, topsoil placement and seeding
Approach
Technique-based
Evidence strength
High evidence — paired sites across 2–22 years
Last assessment
The report cites paired-site evidence and contrasts it with projected convergence at Meandu over 16–36 years.

Assessment summary

The source documents successful establishment of vegetation cover but not recovery of ecosystem function. It classifies the case as decoupling and identifies a material risk of secondary degradation.

Visual context

Site imagery — Bowen Basin
Illustrative placeholder. Location: Bowen Basin, Queensland, Australia. Source: to be supplied at implementation.
Local map — project extent
Geographic extent of the documented intervention.
Before / after — cover change
Illustrative before/after pairing. Real imagery and dates to be sourced at implementation.

Overview

Rehabilitation sites in the Bowen Basin reconstruct spoil landforms, spread topsoil and seed vegetation under regulatory obligations. The documented rehabilitation ages range from two to twenty-two years, but the total extent is not consolidated.

Third-party paired-site studies report established cover dominated by buffel grass, steep slopes, hostile soil chemistry and low resemblance to the intended native ecosystem. The report therefore treats the case as restored cover without restored function.

Context

Climate
Regional rainfall data are drawn from Bureau of Meteorology stations along a regional gradient.
Hydrology
No comparable groundwater or water-stock evidence was available in the documentary assessment.
Soil
Mine spoil with elevated pH and electrical conductivity and low organic matter.
Topography
Reconstructed spoil landforms with slopes reported as 2.5 to 7 times steeper than target conditions.
Initial degradation
Open-cut coal mine spoil with hostile substrates and altered landforms.
Governance
Private coal producers operating under regulatory rehabilitation obligations.

Intervention

What was done: Spoil landforms were reconstructed, topsoil was spread and sites were seeded.

Who carried it out: Coal producers under regulatory obligation.

How it was financed: Regulatory financial provision

Approach type: The report classifies the intervention as technique-based.

Estimated cost: No documentary access to cost per hectare.

Trajectory

Vegetation cover has been established, but the report finds that the restored surface does not converge on the intended native ecosystem function.

2–22 years after rehabilitation

Paired-site evidence documents established cover but persistent functional problems.

16–36 years

A Meandu comparison cited by the report projects convergence over this longer period.

Textual alternative: the trajectory is not a straight line of improvement or decline. Reading it as continuous decline, or as continuous recovery, would both misrepresent it.

Buffel grass, encouraged by fertilisation, is described as locking sites into a monospecific, fire-exposed and ecologically dysfunctional trajectory.

Economics and investment

Two distinct metrics are tracked separately and must never be combined into one figure: documented investment (a specific reported amount, tied to a scope and a date) and cost intensity (a cost-per-hectare or cost-per-outcome rate). A project can have one, both, or neither reported — reporting one is not evidence of the other.

Documented investment
Not reported
Cost intensity
Not reported
Economic model
Regulatory financial provision

Rehabilitation is financed through regulatory provisions imposed on private coal producers, but the report provides no comparable project or per-hectare cost.

Editorial interpretation, not a reported fact: The source notes regulatory financial provision but provides no accessible cost figure.

Evidence gaps

  • Total rehabilitated area is not consolidated.
  • No documentary cost per hectare.
  • No comparable groundwater or water-stock assessment.
  • No surface-energy-flux assessment.
  • No dew monitoring.
  • No project-specific regional climate analysis beyond a bibliographic trend.

People and organisations

Coal producers
Private operators responsible for rehabilitation under regulation.
Australian regulatory authorities
The report identifies regulatory obligation but does not name a specific authority on the project sheet.

Deserts.eco does not publish individual contact details without permission.

Bibliography

  • Régénération des zones arides — Une grille de lecture pour évaluer les trajectoires de régénération et en attribuer les causes. Volet A — Cadrage méthodologique La Manufacture du Climat, prepared for the Regenerative Foundation.
    Supports: Bowen Basin treatment, non-consolidated area, rehabilitation age, third-party evidence, decoupling trajectory and identified evidence gaps.

See the full bibliography

Methodological note

Assessment scope
LMDC comparison of documented mine-rehabilitation outcomes, including paired sites aged 2–22 years.
Limitations
The total area, costs, water stocks and energy fluxes were not available in comparable documentary form.
Methodology version
LMDC first iteration
Date
2026-06